CCTV-monitored manual barrier level crossing on the East Coast route (ELR DOL1).

predicted
CLOSED
for 2 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 now · 2 min late

Next 30 min

CLOSED 18:12–18:14 2m
OPEN 18:14–18:17 3m
CLOSED 18:17–18:20 3m
OPEN 18:20–18:24 4m
CLOSED 18:24–18:30 6m
OPEN 18:30–18:37 7m
CLOSED 18:37–18:40 3m
OPEN 18:40–18:49 → 9m
Under the hood
Thu 08 Oct · 18:12
Today Tomorrow

Trains in window

18:03 🚆 2B25 Leeds → Doncaster Up (N → S) +1 min
18:13 🚄 1A30 Leeds → London Kings Cross Up (N → S) +2 min
18:14 🚃 5R55 Doncaster → Doncaster Down (S → N) active
18:20 🚄 1D23 London Kings Cross → Harrogate Down (S → N) on time
18:27 🚆 2B80 Doncaster → Leeds Down (S → N) active
18:30 🚆 2R53 Adwick → Sheffield Up (N → S) active
18:36 🚛 6E83 Horton in Rib Quarry GBRf → Doncaster Down Decoy GBRF Up (N → S) no show
18:40 🚄 1A31 Bradford Forster Square → London Kings Cross Up (N → S) on time
🚄Express passenger 🚆Passenger 🚃Empty stock 🚛Freight
now 18:12:34 · 202 avg · 8 in window
timetable cif full+upd 2026-10-07..2026-10-09
fetched 02:08:26
trust 33,705 active · 32,066 delays · 2,211 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Dock Hills crossing is predicted to be closed for about 8 h 56 min between 06:00 and 22:00, across roughly 106 closures. The longest single predicted closure is 9 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 10:15–11:15 in the morning and around 14:01–15:01 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Dock Hills is a cctv-monitored manual barrier crossing (CCTV) on the Doncaster–Adwick line (East Coast route · ELR DOL1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →