Balne Lowgate level crossing

Manually-controlled barrier with obstacle detection level crossing on the East Coast route (ELR ECM2).

predicted
OPEN
for 27s

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 3 min Β· 1 min late

Next 30 min

OPEN 10:00–10:00 27s
CLOSED 10:00–10:03 3m
MAY OPEN 10:03–10:04 45s
CLOSED 10:04–10:10 6m
OPEN 10:10–10:21 11m
CLOSED 10:21–10:24 3m
OPEN 10:24–10:32 β†’ 8m
Under the hood
Thu 22 Oct Β· 10:00
Today Tomorrow

Trains in window

09:50 πŸš„ 1V85 Newcastle β†’ Reading Up (N β†’ S) +1 min
09:51 πŸš„ 1S07 London Kings Cross β†’ Edinburgh Down (S β†’ N) +2 min
10:03 πŸš„ 1S08 London Kings Cross β†’ Edinburgh Down (S β†’ N) +1 min
10:07 πŸš„ 1E79 Reading β†’ Newcastle Down (S β†’ N) +2 min
10:08 πŸš„ 1E05 Edinburgh β†’ London Kings Cross Up (N β†’ S) on time
10:10 πŸš„ 1N03 London Kings Cross β†’ Newcastle Down (S β†’ N) -2 min
10:24 πŸš„ 1A61 Sunderland β†’ London Kings Cross Up (N β†’ S) +3 min
πŸš„Express passenger
now 10:00:00 Β· 233 avg Β· 7 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,963 cancelled Β· 9 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Balne Lowgate crossing is predicted to be closed for about 9 h 34 min between 06:00 and 22:00, across roughly 99 closures. The longest single predicted closure is 23 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 08:37–09:37 in the morning and around 13:51–14:51 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Little Common Lane near Balne, North Yorkshire.

Balne Lowgate is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Doncaster West Yard–Selby line (East Coast route · ELR ECM2). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?