Automatic half-barrier level crossing on the East Midlands route (ELR TSN1).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:19 | π 1B28 | Nottingham β London St. Pancras Up (NE β SW) | -1 min |
| 09:25 | π 2A14 | Grimsby Town β Matlock Up (NE β SW) | passed |
| 09:37 | π 2J53 | Matlock β Cleethorpes Down (SW β NE) | +2 min |
| 09:39 | π 1D13 | London St. Pancras β Nottingham Down (SW β NE) | +37 min |
| 09:43 | π 2P56 | Nottingham β Leicester Up (NE β SW) | active |
| 09:48 | π 1G16 | Nottingham β Birmingham New Street Up (NE β SW) | active |
| 09:55 | π 1B31 | Nottingham β London St. Pancras Up (NE β SW) | active |
On todayβs timetable, Barton Lane crossing is predicted to be closed for about 7 h 54 min between 06:00 and 22:00, across roughly 160 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 4.0 min (08:36–08:40, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 10:17β11:17 in the morning and around 19:05β20:05 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Barton Lane in Attenborough, Nottinghamshire.
Barton Lane is a automatic half-barrier crossing (AHB-X) on the Trent SidingsβNottingham line (East Midlands route · ELR TSN1). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 1,718 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.0% of the warnings we could verify came true.
Typical timing error was Β±6s (9 in 10 within 113s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.