Beverley Parks level crossing

Automatic half-barrier level crossing on the North and East route (ELR HBS).

predicted
OPEN
for 24 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 25 min Β· on time

Next 30 min

OPEN 10:42–11:06 24m
CLOSED 11:06–11:08 2m
OPEN 11:08–11:28 β†’ 20m
Under the hood
Thu 22 Oct Β· 10:42
Today Tomorrow

Trains in window

10:35 πŸš„ 1W41 Sheffield β†’ Scarborough Down (S β†’ N) +3 min
10:37 πŸš† 2R06 Bridlington β†’ York Up (N β†’ S) +3 min
11:07 πŸš† 2R09 York β†’ Bridlington Down (S β†’ N) on time
11:08 πŸš„ 1J45 Scarborough β†’ Sheffield Up (N β†’ S) +1 min
πŸš„Express passenger πŸš†Passenger
now 10:42:35 Β· 88 avg Β· 4 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,213 active Β· 31,726 delays Β· 2,031 cancelled Β· 9 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Beverley Parks crossing is predicted to be closed for about 2 h 13 min between 06:00 and 22:00, across roughly 50 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 07:34–08:34 in the morning and around 18:10–19:10 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Long Lane near Woodmansey, East Riding of Yorkshire.

Beverley Parks is a automatic half-barrier crossing (AHB-X) on the Hull–Bridlington line (North and East route · ELR HBS). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?