Beverley North level crossing

CCTV-monitored manual barrier level crossing on the North and East route (ELR HBS).

right now
OPEN
for 7 min
next: 🚧 in 10 min · on time

Next 30 min

OPEN 01:12–01:20 7m
CLOSED 01:20–01:23 3m
OPEN 01:23–03:12+ 1h+
Under the hood
Fri 24 Jul · 01:12
Today Tomorrow

Trains in window

01:23 3Z19 🚧 MALTUSD → MALTUSD → from Bridlington on time
🚧Engineering
now 01:12:51 · 75 avg · 1 in window
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,087 active · 30,125 delays · 1,796 cancelled · 0 reconnects
Nearby crossings

All 867 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Beverley North crossing is predicted to be closed for about 4 h 24 min between 06:00 and 22:00, across roughly 61 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 10:27–11:27 in the morning and around 18:13–19:13 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Beverley North is a cctv-monitored manual barrier crossing (CCTV) on the Hull–Bridlington line (North and East route · ELR HBS). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?