Beverley North level crossing

CCTV-monitored manual barrier level crossing on the North and East route (ELR HBS).

predicted
OPEN
for 16s

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 3 min Β· 1 min late

Next 30 min

OPEN 06:09–06:09 16s
CLOSED 06:09–06:12 3m
OPEN 06:12–06:24 12m
CLOSED 06:24–06:28 3m
OPEN 06:28–06:50 β†’ 22m
Under the hood
Wed 11 Nov Β· 06:09
Today Tomorrow

Trains in window

06:12 πŸš† 2W02 Hull β†’ Bridlington Down (S β†’ N) +1 min
06:27 πŸš„ 1W36 Hull β†’ Bridlington Down (S β†’ N) active
πŸš„Express passenger πŸš†Passenger
now 06:09:10 Β· 73 avg Β· 2 in window
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,681 active Β· 31,186 delays Β· 1,996 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Beverley North crossing is predicted to be closed for about 4 h 20 min between 06:00 and 22:00, across roughly 60 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 07:33–08:33 in the morning and around 17:08–18:08 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Norwood in Beverley, East Riding of Yorkshire.

Beverley North is a CCTV-monitored manual barrier crossing (CCTV) on the Hull–Bridlington line (North and East route · ELR HBS). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?