Blackford level crossing

Manually-controlled barrier level crossing on the Scotland route (ELR SCM4).

predicted
CLOSED
for 3 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 2 min Β· 2 min late

Next 30 min

CLOSED 09:59–10:01 3m
OPEN 10:01–10:14 13m
CLOSED 10:14–10:17 3m
MAY OPEN 10:17–10:18 1m
CLOSED 10:18–10:22 3m
OPEN 10:22–10:35 β†’ 13m
Under the hood
Thu 22 Oct Β· 09:59
Today Tomorrow

Trains in window

09:49 πŸš„ 1H09 Edinburgh β†’ Inverness Down (W β†’ E) +1 min
09:57 πŸš„ 1L57 Glasgow Queen St High Level β†’ Dundee Down (W β†’ E) +1 min
10:01 πŸš„ 1T20 Dundee β†’ Glasgow Queen St High Level Up (E β†’ W) +2 min
10:17 πŸš„ 1E13 Inverness β†’ London Kings Cross Up (E β†’ W) on time
10:21 πŸš„ 1A37 Glasgow Queen St High Level β†’ Aberdeen Down (W β†’ E) on time
πŸš„Express passenger
now 09:59:10 Β· 135 avg Β· 5 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,173 active Β· 31,698 delays Β· 1,962 cancelled Β· 9 reconnects
Nearby crossings

All 113 crossings in Scotland's Railway β†’

About this crossing

How often it closes

On today’s timetable, Blackford crossing is predicted to be closed for about 6 h 58 min between 06:00 and 22:00, across roughly 84 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 07:30–08:30 in the morning and around 13:54–14:54 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on the B8081 in Blackford, Perth and Kinross.

Blackford is a manually-controlled barrier crossing (MCB/MB) on the Dunblane–Perth line (Scotland route · ELR SCM4). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?