Boultham level crossing

CCTV-monitored manual barrier level crossing on the East Midlands route (ELR NOB1).

predicted
OPEN
for 6 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 9 min · running

Next 30 min

OPEN 07:45–07:51 6m
CLOSED 07:51–07:55 4m
OPEN 07:55–08:18 → 23m
Under the hood
Tue 06 Oct · 07:45
Today Tomorrow

Trains in window

07:43 🚛 6E46 Kingsbury Oil Sdgs → Humber Oil Refinery Down (SW → NE) no show
07:54 🚆 2D40 Lincoln → Nottingham Up (NE → SW) active
07:55 🚆 2K05 Newark North Gate → Peterborough Down (SW → NE) on time
🚆Passenger 🚛Freight
now 07:45:12 · 98 avg · 3 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-05..2026-10-07
fetched 02:08:18
trust 33,436 active · 31,727 delays · 1,706 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Boultham crossing is predicted to be closed for about 5 h 11 min between 06:00 and 22:00, across roughly 64 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.2 min (06:54–07:00, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:49–08:49 in the morning and around 12:15–13:15 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Boultham is a cctv-monitored manual barrier crossing (CCTV) on the Newark North Gate–Worksop line (East Midlands route · ELR NOB1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 565 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 97.9% of the warnings we could verify came true.

Full accuracy report →

Is this right?