CCTV-monitored manual barrier level crossing on the East Midlands route (ELR SPD3).
| 01:07 | 4L88 | 🚛 | LEEDFLT → THMSFLI | → from Worksop | -8 min |
| 01:15 | 4L39 | 🚛 | NORMGBF → TLBYTCG | → from Worksop | -8 min |
| 01:24 | 4L73 | 🚛 | MBROSTY → FLXSNEW | → from Worksop | -36 min |
On today’s timetable, Lincoln High Street crossing is predicted to be closed for about 8 h 33 min between 06:00 and 22:00, across roughly 83 closures. The longest single predicted closure is 14 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 3.2 min (00:35–00:38, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:35–07:35 in the morning and around 17:47–18:47 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Lincoln High Street is a cctv-monitored manual barrier crossing (CCTV) on the Barnetby Sdgs Colas Rail–Worksop line (East Midlands route · ELR SPD3). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 966 trains through this crossing.
99.3% of observed passes were being warned about on this page when they passed, and 93.3% of the warnings we could verify came true.
Typical timing error was ±33s (9 in 10 within 163s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.