Bradford on Tone level crossing

Automatic half-barrier level crossing on the Western route (ELR MLN1).

predicted
OPEN
for 18 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 20 min · 6 min early

Next 30 min

OPEN 02:12–02:31 18m
CLOSED 02:31–02:32 2m
OPEN 02:32–04:12+ 1h+
Under the hood
Mon 07 Sep · 02:12
Today Tomorrow

Trains in window

02:32 🚄 1C50 London PaddingtonPenzance Down (NE → SW) -6 min
🚄Express passenger
now 02:12:47 · 117 avg · 1 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 48,283 active · 21,045 delays · 2,871 cancelled · 0 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Bradford on Tone crossing is predicted to be closed for about 3 h 51 min between 06:00 and 22:00, across roughly 98 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (01:27–01:29, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 09:37–10:37 in the morning and around 19:19–20:19 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Bradford on Tone is a automatic half-barrier crossing (AHB) on the Weston-super-Mare–Exeter Riverside N.Y. line (Western route · ELR MLN1). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 779 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.0% of the warnings we could verify came true.

Typical timing error was ±3s (9 in 10 within 205s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?