Victory level crossing

Automatic half-barrier level crossing on the Western route (ELR MLN1).

right now
OPEN
for 9 min
next: 🚧 in 10 min · 11 min late

Next 30 min

OPEN 02:04–02:13 9m
CLOSED 02:13–02:14 2m
OPEN 02:14–03:43 → 89m
Under the hood
Fri 24 Jul · 02:04
Today Tomorrow

Trains in window

01:57 1A50 🚄 PENZNCE → PADTON → from Exeter Riverside N.Y. +23 min
02:14 3Z15 🚧 RDNGTRS → FRWAYD ← from Weston-super-Mare +11 min
🚄Express passenger 🚧Engineering
now 02:04:32 · 132 avg · 2 in window
lx berths down: EX/E020→EX/[email protected] · down: EX/E120→EX/[email protected] · down: EX/E322→EX/[email protected] · up: EX/E079→EX/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,100 active · 30,165 delays · 1,822 cancelled · 0 reconnects
Nearby crossings

All 228 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Victory crossing is predicted to be closed for about 4 h 8 min between 06:00 and 22:00, across roughly 92 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (00:10–00:12, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:14–07:14 in the morning and around 15:38–16:38 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Victory is a automatic half-barrier crossing (AHB) on the Weston-super-Mare–Exeter Riverside N.Y. line (Western route · ELR MLN1). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 770 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 97.6% of the warnings we could verify came true.

Typical timing error was ±31s (9 in 10 within 118s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?