Victory level crossing

Automatic half-barrier level crossing on the Western route (ELR MLN1).

predicted
OPEN
for 15s

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 2 min · 17 min early

Next 30 min

OPEN 02:37–02:37 15s
CLOSED 02:37–02:39 2m
OPEN 02:39–04:37+ 1h+
Under the hood
Thu 15 Oct · 02:37
Today Tomorrow

Trains in window

02:38 🚄 1C50 London Paddington → Penzance Down (NE → SW) approaching
🚄Express passenger
now 02:37:27 · 120 avg · 1 in window
live observation: 1 up · 3 down
timetable cif full+upd 2026-10-14..2026-10-16
fetched 02:08:21
trust 32,467 active · 31,160 delays · 1,738 cancelled · 9 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Victory crossing is predicted to be closed for about 3 h 53 min between 06:00 and 22:00, across roughly 87 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (00:09–00:11, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:13–07:13 in the morning and around 19:23–20:23 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Allerford Road in Allerford, Somerset.

Victory is a automatic half-barrier crossing (AHB) on the Taunton–Exeter Riverside N.Y. line (Western route · ELR MLN1). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 733 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.7% of the warnings we could verify came true.

Typical timing error was ±122s (9 in 10 within 256s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?