Butterswood level crossing

Automatic barrier locally monitored level crossing on the North and East route (ELR BAR).

predicted
OPEN
for 13 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 15 min · 1 min late

Next 30 min

OPEN 07:13–07:26 13m
CLOSED 07:26–07:27 2m
OPEN 07:27–08:06 → 39m
Under the hood
Mon 07 Sep · 07:13
Today Tomorrow

Trains in window

07:27 🚆 2F81 CleethorpesBarton-on-Humber Down (S → N) +1 min
🚆Passenger
now 07:13:05 · 14 avg · 1 in window
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,152 active · 25,056 delays · 3,031 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Butterswood crossing is predicted to be closed for about 37 min between 06:00 and 22:00, across roughly 15 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 09:26–10:26 in the morning and around 13:26–14:26 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Butterswood is a automatic barrier locally monitored crossing (ABCL-X) on the Lindsey Oil Refinery COLAS–Barton-on-Humber line (North and East route · ELR BAR). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?