Buttington level crossing

Automatic half-barrier level crossing on the Wales route (ELR SBA2).

predicted
OPEN
for the next 30 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚧 in 21 min · scheduled

Next 30 min

OPEN 14:08–15:00 → 52m
Under the hood
Fri 23 Oct · 14:08
Today Tomorrow

Trains in window

14:30 🚧 6J16 Talerddig → Coleham LMD Up (W → E) sched
🚧Engineering
now 14:08:41 · 30 avg · 1 in window
timetable cif full+upd 2026-10-22..2026-10-24
fetched 02:08:21
trust 34,831 active · 31,085 delays · 3,172 cancelled · 0 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Buttington crossing is predicted to be closed for about 44 min between 06:00 and 22:00, across roughly 17 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 08:50–09:50 in the morning and around 14:53–15:53 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Buttington Cross in Buttington, Powys.

Buttington is a automatic half-barrier crossing (AHB) on the Westbury (Salop) Down–Machynlleth line (Wales route · ELR SBA2). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?