Eyton level crossing

Automatic half-barrier level crossing on the Wales route (ELR WSJ2).

right now
OPEN
for 4 min
next: 🚄 in 6 min · 1 min early

Next 30 min

OPEN 01:10–01:15 4m
CLOSED 01:15–01:16 2m
OPEN 01:16–02:41 → 85m
Under the hood
Fri 24 Jul · 01:10
Today Tomorrow

Trains in window

01:16 1W89 🚄 CRDFCEN → CREWE ← from Shrewsbury -1 min
🚄Express passenger
now 01:10:45 · 128 avg · 1 in window
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,086 active · 30,123 delays · 1,792 cancelled · 0 reconnects
Nearby crossings

All 228 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Eyton crossing is predicted to be closed for about 3 h 5 min between 06:00 and 22:00, across roughly 73 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 08:07–09:07 in the morning and around 18:50–19:50 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Eyton is a automatic half-barrier crossing (AHB-X) on the Shrewsbury–Wrexham General line (Wales route · ELR WSJ2). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?