Harlescott level crossing

Manually-controlled barrier with obstacle detection level crossing on the Wales route (ELR SYC).

right now
OPEN
for at least 2h

Next 30 min

OPEN 01:10–03:10+ 2h+
Under the hood
Fri 24 Jul · 01:10
Today Tomorrow

Trains in window

No trains in the next 30 minutes.
now 01:10:55 · 79 avg · 0 in window
lx berths down: C3/8361→C3/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,086 active · 30,123 delays · 1,793 cancelled · 0 reconnects
Nearby crossings

All 228 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Harlescott crossing is predicted to be closed for about 3 h 51 min between 06:00 and 22:00, across roughly 51 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (00:11–00:14, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:00–09:00 in the morning and around 19:44–20:44 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Harlescott is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Shrewsbury–Yorton line (Wales route · ELR SYC). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 209 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.9% of the warnings we could verify came true.

Typical timing error was ±24s (9 in 10 within 354s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?