Cargo Fleet Road level crossing

CCTV-monitored manual barrier level crossing on the North and East route (ELR MBW1).

predicted
OPEN
for 1 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 4 min Β· 6 min late

Next 30 min

OPEN 10:00–10:01 1m
CLOSED 10:01–10:08 7m
MAY OPEN 10:08–10:10 2m
CLOSED 10:10–10:14 4m
OPEN 10:14–10:22 8m
CLOSED 10:22–10:25 3m
MAY OPEN 10:25–10:26 1m
CLOSED 10:26–10:30 3m
OPEN 10:30–10:38 β†’ 9m
Under the hood
Thu 22 Oct Β· 10:00
Today Tomorrow

Trains in window

09:52 πŸš› 4D08 Tees Dock GBRF β†’ Doncaster Iport GBRF Down (NW β†’ SE) no show
09:52 πŸš† 2D13 Saltburn β†’ Bishop Auckland Up (SE β†’ NW) no show
09:56 πŸš› 6F23 Middlesbrough (FHH) β†’ Boulby Mine Carlin How FHH Down (NW β†’ SE) no show
09:57 πŸš„ 1J57 Middlesbrough β†’ Carlisle Down (NW β†’ SE) on time
09:58 πŸš„ 1P63 Manchester Airport β†’ Redcar Central Down (NW β†’ SE) passed
10:04 πŸš† 2W08 Newcastle β†’ Middlesbrough Up (SE β†’ NW) approaching
10:07 πŸš„ 1J68 Carlisle β†’ Middlesbrough Up (SE β†’ NW) approaching
10:13 πŸš› 4E55 Felixstowe North F.L.T. β†’ Tees Dock Corus (FLT) Down (NW β†’ SE) +4 min
10:13 πŸš† 2W11 Nunthorpe β†’ Newcastle Down (NW β†’ SE) on time
10:13 πŸš„ 1P68 Redcar Central β†’ Manchester Airport Up (SE β†’ NW) active
10:25 πŸš† 2D15 Saltburn β†’ Darlington Up (SE β†’ NW) active
10:29 πŸš† 2D20 Darlington β†’ Saltburn Down (NW β†’ SE) active
πŸš„Express passenger πŸš†Passenger πŸš›Freight
now 10:00:11 Β· 306 avg Β· 12 in window
live observation: 2 up Β· 4 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,963 cancelled Β· 9 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Cargo Fleet Road crossing is predicted to be closed for about 9 h 56 min between 06:00 and 22:00, across roughly 99 closures. The longest single predicted closure is 15 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 10.4 min (08:46–08:56, 4 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 10:10–11:10 in the morning and around 17:21–18:21 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on a footpath in Middlesbrough, North Yorkshire.

Cargo Fleet Road is a CCTV-monitored manual barrier crossing (CCTV) on the Middlesborough Signal 221–Nunthorpe line (North and East route · ELR MBW1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 922 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.1% of the warnings we could verify came true.

Full accuracy report β†’

Is this right?