Manually-controlled barrier with obstacle detection level crossing on the North and East route (ELR LEN3).

predicted
CLOSED
for 2 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 2 min Β· 1 min early

Next 30 min

CLOSED 06:20–06:23 2m
OPEN 06:23–06:41 18m
CLOSED 06:41–06:44 3m
OPEN 06:44–06:54 β†’ 9m
Under the hood
Wed 11 Nov Β· 06:20
Today Tomorrow

Trains in window

06:23 πŸš† 2W03 Middlesbrough β†’ Newcastle Down (W β†’ E) approaching
06:44 πŸšƒ 3Y81 Heaton T&R.S.M.D. β†’ Middlesbrough Up (E β†’ W) +1 min
06:52 πŸš› 6E30 Margam T.C. β†’ Hartlepool BSC 20 Mill Down (W β†’ E) +51 min
πŸš†Passenger πŸšƒEmpty stock πŸš›Freight
now 06:20:51 Β· 102 avg Β· 3 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,688 active Β· 31,197 delays Β· 1,985 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Billingham crossing is predicted to be closed for about 4 h 41 min between 06:00 and 22:00, across roughly 66 closures. The longest single predicted closure is 11 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 08:15–09:15 in the morning and around 17:38–18:38 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Station Road in Billingham, County Durham.

Billingham is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Norton East Jn.–Hartlepool BSC 20 Mill line (North and East route · ELR LEN3). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 291 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.2% of the warnings we could verify came true.

Full accuracy report β†’