Norton-On-Tees level crossing

Manually-controlled barrier with obstacle detection level crossing on the North and East route (ELR LEN3).

predicted
OPEN
for at least 2h

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 02:50–04:50+ 2h+
Under the hood
Fri 13 Nov · 02:50
Today Tomorrow

Trains in window

No trains in the next 30 minutes.
now 02:50:40 · 94 avg · 0 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-11-12..2026-11-14
fetched 02:08:19
trust 32,665 active · 30,830 delays · 2,096 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Norton-On-Tees crossing is predicted to be closed for about 4 h 38 min between 06:00 and 22:00, across roughly 59 closures. The longest single predicted closure is 9 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 06:20–07:20 in the morning and around 18:03–19:03 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Station Road near Billingham, County Durham.

Norton-On-Tees is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Norton West Jn–Hartlepool BSC 20 Mill line (North and East route · ELR LEN3). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 545 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 97.7% of the warnings we could verify came true.

Full accuracy report →

Is this right?