Castleford Gates level crossing

Manually-controlled barrier level crossing on the North and East route (ELR NOC).

predicted
OPEN
for 17s

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 3 min Β· 4 min late

Next 30 min

OPEN 07:23–07:23 17s
CLOSED 07:23–07:27 3m
OPEN 07:27–07:30 3m
CLOSED 07:30–07:34 3m
OPEN 07:34–07:45 11m
CLOSED 07:45–07:48 3m
OPEN 07:48–07:55 β†’ 7m
Under the hood
Wed 11 Nov Β· 07:23
Today Tomorrow

Trains in window

07:15 πŸš† 2F22 Castleford β†’ Leeds Up (E β†’ W) on time
07:17 πŸš† 2F03 Leeds β†’ Knottingley Down (W β†’ E) +1 min
07:20 πŸš† 2U27 Manchester Piccadilly β†’ York Down (W β†’ E) passed
07:27 πŸš† 2U30 York β†’ Manchester Piccadilly Up (E β†’ W) approaching
07:33 πŸš† 2F42 Knottingley β†’ Leeds Up (E β†’ W) on time
07:48 πŸš† 2L55 Leeds β†’ Sheffield Down (W β†’ E) active
πŸš†Passenger
now 07:23:41 Β· 158 avg Β· 6 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,738 active Β· 31,246 delays Β· 2,042 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Castleford Gates crossing is predicted to be closed for about 7 h 10 min between 06:00 and 22:00, across roughly 95 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 5.5 min (06:32–06:38, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 09:38–10:38 in the morning and around 20:15–21:15 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Albion Street in Castleford, West Yorkshire.

Castleford Gates is a manually-controlled barrier crossing (MCB/MB) on the Wakefield Kirkgate S&TE–Milford West Sidings line (North and East route · ELR NOC). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 895 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Typical timing error was Β±69s (9 in 10 within 364s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’