Streethouse West level crossing

CCTV-monitored manual barrier level crossing on the North and East route (ELR WAG1).

predicted
OPEN
for 12 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚃 in 16 min · 1 min late

Next 30 min

OPEN 07:12–07:24 12m
CLOSED 07:24–07:28 5m
OPEN 07:28–07:50 → 21m
Under the hood
Mon 07 Sep · 07:12
Today Tomorrow

Trains in window

07:28 🚃 6E36 Liverpool Biomass TML GBFDrax AES Down (W → E) +1 min
🚃Empty stock
now 07:12:35 · 53 avg · 1 in window
live observation: 1 up · 2 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,149 active · 25,042 delays · 3,032 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Streethouse West crossing is predicted to be closed for about 2 h 28 min between 06:00 and 22:00, across roughly 32 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (05:51–05:54, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:20–08:20 in the morning and around 12:33–13:33 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Streethouse West is a cctv-monitored manual barrier crossing (CCTV) on the Wakefield Kirkgate–Knottingley line (North and East route · ELR WAG1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 352 trains through this crossing.

99.7% of observed passes were being warned about on this page when they passed, and 99.4% of the warnings we could verify came true.

Typical timing error was ±13s (9 in 10 within 208s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?