Church Street level crossing

Trainman-operated gate level crossing on the West Coast South route (ELR WOW2).

predicted
OPEN
for at least 2h

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 10:00–12:00+ 2h+
Under the hood
Thu 22 Oct · 10:00
Today Tomorrow

Trains in window

No trains in the next 30 minutes.
now 10:00:43 · 2 avg · 0 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active · 31,699 delays · 1,965 cancelled · 9 reconnects
Nearby crossings

All 148 crossings in North West and Central →

About this crossing

How often it closes

On today’s timetable, Church Street crossing is predicted to be closed for about 4 min between 06:00 and 22:00, across roughly 2 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 07:16–08:16 in the morning. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is in Wolverton, Buckinghamshire.

Church Street is a trainman-operated gate crossing (TMOG) on the Milton Keynes Central–Northampton Gateway DBC line (West Coast South route · ELR WOW2). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?