Cove level crossing

CCTV-monitored manual barrier level crossing on the Scotland route (ELR WCM1).

predicted
OPEN
for the next 30 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 03:13–04:23 → 70m
Under the hood
Tue 08 Sep · 03:13
Today Tomorrow

Trains in window

03:12 🚛 6S03 Kingmoor Down Recess SDGsMossend PD Stirling GBRf Down (E → W) active
03:35 🚄 1S04 Birmingham InternationalMossend Down Yard Down (E → W) no show
🚄Express passenger 🚛Freight
now 03:13:09 · 166 avg · 2 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-07..2026-09-09
fetched 02:08:21
trust 32,795 active · 29,833 delays · 1,960 cancelled · 0 reconnects
Nearby crossings

All 113 crossings in Scotland's Railway →

About this crossing

How often it closes

On today’s timetable, Cove crossing is predicted to be closed for about 6 h 48 min between 06:00 and 22:00, across roughly 80 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (00:23–00:26, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 09:43–10:43 in the morning and around 17:42–18:42 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Cove is a cctv-monitored manual barrier crossing (CCTV) on the Carlisle Network Yard–Lockerbie line (Scotland route · ELR WCM1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 821 trains through this crossing.

99.9% of observed passes were being warned about on this page when they passed, and 99.2% of the warnings we could verify came true.

Typical timing error was ±3s (9 in 10 within 219s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?