CCTV-monitored manual barrier level crossing on the North West route (ELR WCM1).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:51 | π 1M36 | Shieldmuir RMT β Daventry INT RFT Recep RFD Up (NW β SE) | cancelled |
| 09:58 | π 1S00 | London Euston β Stirling Down (SE β NW) | passed |
| 10:00 | π 1L78 | Carlisle β Glasgow Central High Level Down (SE β NW) | on time |
| 10:09 | π 9M52 | Edinburgh β London Euston Up (NW β SE) | +9 min |
| 10:10 | β 0Z06 | Polmadie Car M.D. β Wembley Receptions 1-7 Up (NW β SE) | no show |
| 10:13 | π 1S39 | Birmingham New Street β Glasgow Central High Level Down (SE β NW) | +6 min |
| 10:23 | π 1S41 | Liverpool Lime Street HL/ML β Glasgow Central High Level Down (SE β NW) | +8 min |
| 10:27 | π 1M84 | Glasgow Central High Level β Manchester Airport Up (NW β SE) | on time |
| 10:28 | π 6S37 | Carlisle Network Yard β Ravenstruther Colas Down (SE β NW) | active |
| 10:31 | π 2L81 | Dumfries β Carlisle Up (NW β SE) | active |
On todayβs timetable, Floriston crossing is predicted to be closed for about 8 h 42 min between 06:00 and 22:00, across roughly 104 closures. The longest single predicted closure is 13 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 6.7 min (09:22–09:29, 3 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 09:48β10:48 in the morning and around 13:46β14:46 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is near Metal Bridge, Cumbria.
Floriston is a CCTV-monitored manual barrier crossing (CCTV) on the Carlisle Network YardβDumfries line (North West route · ELR WCM1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 992 trains through this crossing.
99.0% of observed passes were being warned about on this page when they passed, and 98.9% of the warnings we could verify came true.
Typical timing error was Β±46s (9 in 10 within 65s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.