CCTV-monitored manual barrier level crossing on the North West route (ELR SDJ2).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:51 | π 1E56 | Chester β Leeds Down (NW β SE) | no show |
| 09:56 | π 4O73 | Seaforth C.T. β Dollands Moor Up (SE β NW) | no show |
| 09:59 | π 6N42 | Tunstead Sdgs (FHH) β Leyland B. Leyland Down (NW β SE) | no show |
| 10:02 | π 6E09 | Liverpool Biomass TML GBF β Drax AES Up (SE β NW) | +65 min |
| 10:13 | π 1D34 | Manchester Airport β Holyhead Up (SE β NW) | active |
| 10:14 | β 0K49 | Carlisle Upperby TMD LSL β Crewe H.S. Up (SE β NW) | no show |
| 10:23 | π 1S45 | London Euston β Glasgow Central High Level Down (NW β SE) | +4 min |
| 10:24 | π 4M27 | Coatbridge (DRS) β Daventry Int RFT Recep FL Up (SE β NW) | -1 min |
| 10:25 | π 1M08 | Glasgow Central High Level β London Euston Up (SE β NW) | +5 min |
| 10:25 | π 1H84 | Holyhead β Manchester Airport Down (NW β SE) | +2 min |
On todayβs timetable, Crosfield's crossing is predicted to be closed for about 8 h 9 min between 06:00 and 22:00, across roughly 93 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 4.8 min (06:41–06:45, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 09:28β10:28 in the morning and around 12:15β13:15 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Factory Lane in Warrington, Cheshire, next to Warrington Bank Quay station.
Crosfield's is a CCTV-monitored manual barrier crossing (CCTV) on the Arpley SidingsβDallam Junction line (North West route · ELR SDJ2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 625 trains through this crossing.
97.3% of observed passes were being warned about on this page when they passed, and 99.0% of the warnings we could verify came true.
Typical timing error was Β±2s (9 in 10 within 65s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.