Navigation Road level crossing

CCTV-monitored manual barrier level crossing on the North West route (ELR CDM1).

BetaMetrolink trams use this crossing as well as trains, and closures for them are now shown. They come from the published tram timetable: we don't receive live tram running data, so a tram that is delayed, early or cancelled won't be reflected here. Train times are live as normal. If something looks wrong, please tell us — it genuinely helps.
predicted
CLOSED
for 4 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 now · 4 min late

Next 30 min

CLOSED 07:03–07:08 4m
MAY OPEN 07:08–07:10 2m
CLOSED 07:10–07:10 46s
OPEN 07:10–07:15 4m
CLOSED 07:15–07:15 46s
MAY OPEN 07:15–07:17 2m
CLOSED 07:17–07:18 46s
OPEN 07:18–07:22 4m
CLOSED 07:22–07:23 46s
MAY OPEN 07:23–07:25 2m
CLOSED 07:25–07:25 46s
OPEN 07:25–07:28 2m
CLOSED 07:28–07:31 3m
MAY OPEN 07:31–07:32 31s
CLOSED 07:32–07:38 → 6m
Under the hood
Tue 06 Oct · 07:03
Today Tomorrow

Trains in window

07:03 🚆 2H30 Chester → Manchester Piccadilly Up (S → N) +4 min
07:07 🚆 2D40 Manchester Piccadilly → Chester Down (N → S) +36 min
07:08 🚊 Metrolink trams timetable
07:10 🚊 Metrolink trams timetable
07:15 🚊 Metrolink trams timetable
07:18 🚊 Metrolink trams timetable
07:23 🚊 Metrolink trams timetable
07:25 🚊 Metrolink trams timetable
07:30 🚊 Metrolink trams timetable
07:31 🚆 2D41 Manchester Piccadilly → Chester Down (N → S) active
07:33 🚊 Metrolink trams timetable
07:36 🚛 6G99 Tunstead Sidings GBRF → Banbury Reservoir Tarmac Down (N → S) -8 min
🚆Passenger 🚊Tram / Metro 🚛Freight
now 07:03:49 · 86 avg · 12 in window
timetable cif full+upd 2026-10-05..2026-10-07
fetched 02:08:18
trust 33,368 active · 31,686 delays · 1,693 cancelled · 0 reconnects
Nearby crossings

All 148 crossings in North West and Central →

About this crossing

How often it closes

On today’s timetable, Navigation Road crossing is predicted to be closed for about 8 h 26 min between 06:00 and 22:00, across roughly 226 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 09:07–10:07 in the morning and around 13:10–14:10 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Navigation Road is a cctv-monitored manual barrier crossing (CCTV) on the Stockport–Altrincham line (North West route · ELR CDM1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?