Clayton Bridge level crossing

Manually-controlled barrier with obstacle detection level crossing on the North West route (ELR MVL1).

predicted
CLOSED
for 4 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ now Β· 3 min late

Next 30 min

CLOSED 07:32–07:35 4m
OPEN 07:35–07:46 10m
CLOSED 07:46–07:51 6m
OPEN 07:51–07:56 4m
CLOSED 07:56–07:59 4m
OPEN 07:59–08:02 β†’ 2m
Under the hood
Wed 11 Nov Β· 07:32
Today Tomorrow

Trains in window

07:22 πŸš„ 1P63 Manchester Airport β†’ Redcar Central Down (W β†’ E) +4 min
07:28 πŸš„ 1P08 Leeds β†’ Manchester Victoria Up (E β†’ W) passed
07:33 πŸš„ 1P58 York β†’ Manchester Airport Up (E β†’ W) approaching
07:35 πŸš„ 1K09 Liverpool Lime Street HL/ML β†’ Hull Down (W β†’ E) approaching
07:49 πŸš„ 1P15 Manchester Victoria β†’ Scarborough Down (W β†’ E) active
07:51 πŸš„ 1K06 Hull β†’ Liverpool Lime Street HL/ML Up (E β†’ W) +7 min
07:58 πŸš† 2W05 Stalybridge β†’ Southport Up (E β†’ W) active
07:59 πŸš† 2W42 Southport β†’ Stalybridge Down (W β†’ E) +3 min
πŸš„Express passenger πŸš†Passenger
now 07:32:03 Β· 200 avg Β· 8 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,745 active Β· 31,252 delays Β· 2,045 cancelled Β· 0 reconnects
Nearby crossings

All 148 crossings in North West and Central β†’

About this crossing

How often it closes

On today’s timetable, Clayton Bridge crossing is predicted to be closed for about 8 h 43 min between 06:00 and 22:00, across roughly 102 closures. The longest single predicted closure is 14 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.3 min (06:22–06:28, 3 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:07–09:07 in the morning and around 12:00–13:00 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Berry Brow in Failsworth, Greater Manchester.

Clayton Bridge is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Manchester Victoria–Stalybridge line (North West route · ELR MVL1). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 1,232 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.6% of the warnings we could verify came true.

Typical timing error was Β±1s (9 in 10 within 9s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?