Smithy Bridge level crossing

Manually-controlled barrier with obstacle detection level crossing on the North West route (ELR MVN2).

predicted
CLOSED
for 22s

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 4 min Β· 1 min late

Next 30 min

CLOSED 07:22–07:22 22s
MAY OPEN 07:22–07:23 34s
CLOSED 07:23–07:26 3m
MAY OPEN 07:26–07:27 47s
CLOSED 07:27–07:30 3m
OPEN 07:30–07:45 15m
CLOSED 07:45–07:50 5m
OPEN 07:50–07:53 β†’ 2m
Under the hood
Mon 12 Oct Β· 07:22
Today Tomorrow

Trains in window

07:13 πŸš„ 1J03 Leeds β†’ Manchester Victoria Up (NE β†’ SW) +3 min
07:13 πŸš„ 1J02 Manchester Victoria β†’ Leeds Down (SW β†’ NE) +1 min
07:21 πŸš† 2N91 Wigan Wallgate β†’ Blackburn Down (SW β†’ NE) passed
07:26 πŸš† 2K62 Blackburn β†’ Headbolt Lane Up (NE β†’ SW) approaching
07:30 πŸš† 2I04 Leeds β†’ Wigan Wallgate Up (NE β†’ SW) on time
07:48 πŸš„ 1D71 Leeds β†’ Chester Up (NE β†’ SW) +5 min
07:50 πŸš„ 1E50 Chester β†’ Leeds Down (SW β†’ NE) +13 min
πŸš„Express passenger πŸš†Passenger
now 07:22:04 Β· 175 avg Β· 7 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-11..2026-10-13
fetched 02:08:22
trust 48,759 active Β· 25,401 delays Β· 2,533 cancelled Β· 0 reconnects
Nearby crossings

All 148 crossings in North West and Central β†’

About this crossing

How often it closes

On today’s timetable, Smithy Bridge crossing is predicted to be closed for about 8 h 43 min between 06:00 and 22:00, across roughly 117 closures. The longest single predicted closure is 9 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 7.0 min (00:18–00:25, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:38–07:38 in the morning and around 14:41–15:41 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Smithybridge Road in Smithy Bridge, Greater Manchester, next to the station.

Smithy Bridge is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Rochdale–Todmorden line (North West route · ELR MVN2). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 1,245 trains through this crossing.

99.9% of observed passes were being warned about on this page when they passed, and 99.5% of the warnings we could verify came true.

Typical timing error was Β±9s (9 in 10 within 349s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?