Manually-controlled barrier with obstacle detection level crossing on the North West route (ELR FHR5).
| No trains in the next 30 minutes. |
On today’s timetable, Huncoat crossing is predicted to be closed for about 6 h 13 min between 06:00 and 22:00, across roughly 65 closures. The longest single predicted closure is 15 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 6.0 min (00:21–00:27, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 10:39–11:39 in the morning and around 18:57–19:57 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Huncoat is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Blackburn–Burnley Manchester Road line (North West route · ELR FHR5). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 690 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 98.5% of the warnings we could verify came true.
Typical timing error was ±95s (9 in 10 within 172s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.