Trainman-operated barrier level crossing on the North West route (ELR GJC).
| No trains in the next 30 minutes. |
On today’s timetable, Chaffers crossing is predicted to be closed for about 1 h 19 min between 06:00 and 22:00, across roughly 32 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 06:00–07:00 in the morning and around 18:56–19:56 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Chaffers is a trainman-operated barrier crossing (TOB) on the Blackburn–Colne line (North West route · ELR GJC). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →