Towneley level crossing

Manually-controlled barrier level crossing on the North West route (ELR FHR6).

predicted
OPEN
for 4 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 7 min · on time

Next 30 min

OPEN 07:18–07:22 4m
CLOSED 07:22–07:25 3m
OPEN 07:25–07:37 13m
CLOSED 07:37–07:41 3m
MAY OPEN 07:41–07:42 1m
CLOSED 07:42–07:45 3m
OPEN 07:45–08:03 → 18m
Under the hood
Tue 06 Oct · 07:18
Today Tomorrow

Trains in window

07:25 🚄 1B16 Blackpool North → York Down (NW → SE) approaching
07:40 🚆 2K63 Blackburn → Headbolt Lane Down (NW → SE) active
07:45 🚆 2N91 Wigan Wallgate → Blackburn Up (SE → NW) on time
07:48 🚛 6E78 Leyland Sidings GBRF → Doncaster Down Decoy GBRF Down (NW → SE) no show
🚄Express passenger 🚆Passenger 🚛Freight
now 07:18:26 · 78 avg · 4 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-05..2026-10-07
fetched 02:08:18
trust 33,395 active · 31,702 delays · 1,701 cancelled · 0 reconnects
Nearby crossings

All 148 crossings in North West and Central →

About this crossing

How often it closes

On today’s timetable, Towneley crossing is predicted to be closed for about 4 h 16 min between 06:00 and 22:00, across roughly 52 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (06:21–06:25, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:00–07:00 in the morning and around 12:36–13:36 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Towneley is a manually-controlled barrier crossing (MCB/MB) on the Blackburn–Hebden Bridge line (North West route · ELR FHR6). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 484 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Typical timing error was ±2s (9 in 10 within 6s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?