Dilston level crossing

Automatic half-barrier level crossing on the North and East route (ELR NEC2).

predicted
OPEN
for 13 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 14 min · on time

Next 30 min

OPEN 07:12–07:25 13m
CLOSED 07:25–07:26 2m
OPEN 07:26–07:41 14m
CLOSED 07:41–07:42 → 2m
Under the hood
Mon 07 Sep · 07:12
Today Tomorrow

Trains in window

07:03 🚧 3J77 Carlisle Yard Colas RailNunthorpe Up (W → E) cancelled
07:06 🚛 6M10 South Bank Tees Dock (FHH)New Biggin FLHH Down (E → W) no show
07:26 🚄 1J66 CarlisleMiddlesbrough Up (W → E) on time
07:42 🚄 1N51 MiddlesbroughCarlisle Down (E → W) on time
🚄Express passenger 🚛Freight 🚧Engineering
now 07:12:08 · 80 avg · 4 in window
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,149 active · 25,036 delays · 3,031 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Dilston crossing is predicted to be closed for about 3 h 17 min between 06:00 and 22:00, across roughly 74 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 08:16–09:16 in the morning and around 19:23–20:23 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Dilston is a automatic half-barrier crossing (AHB) on the MetroCentre–Hexham line (North and East route · ELR NEC2). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?