Haydon Bridge level crossing

Manually-controlled barrier level crossing on the North and East route (ELR NEC2).

predicted
OPEN
for 14 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 17 min Β· 8 min late

Next 30 min

OPEN 09:59–10:13 14m
CLOSED 10:13–10:19 5m
OPEN 10:19–10:29 10m
CLOSED 10:29–10:32 β†’ 3m
Under the hood
Thu 22 Oct Β· 09:59
Today Tomorrow

Trains in window

10:01 🚧 6E48 Carlisle Network Yard β†’ Tyne S.S. Up (SW β†’ NE) no show
10:16 πŸš„ 1N59 Newcastle β†’ Carlisle Down (NE β†’ SW) +8 min
10:18 πŸš„ 1J72 Carlisle β†’ Middlesbrough Up (SW β†’ NE) +1 min
10:32 πŸš„ 1N52 Carlisle β†’ Newcastle Up (SW β†’ NE) on time
πŸš„Express passenger 🚧Engineering
now 09:59:32 Β· 80 avg Β· 4 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,698 delays Β· 1,961 cancelled Β· 9 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Haydon Bridge crossing is predicted to be closed for about 4 h 9 min between 06:00 and 22:00, across roughly 53 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 08:33–09:33 in the morning and around 18:49–19:49 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Church Street in Haydon Bridge, Northumberland, next to the station.

Haydon Bridge is a manually-controlled barrier crossing (MCB/MB) on the Hexham–Carlisle line (North and East route · ELR NEC2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’