Manually-controlled barrier with obstacle detection level crossing on the Western route (ELR MLN4).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 10:12 | π 2P09 | Penzance β Plymouth Up (W β E) | on time |
| 10:17 | π 1C11 | Bristol Temple Meads β Penzance Down (E β W) | cancelled |
| 10:24 | π 2C05 | Exeter St. David's β Penzance Down (E β W) | +34 min |
On todayβs timetable, Dolcoath crossing is predicted to be closed for about 3 h 37 min between 06:00 and 22:00, across roughly 50 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 10:38β11:38 in the morning and around 18:50β19:50 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Lower Pengegon in Camborne, Cornwall.
Dolcoath is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the RedruthβSt. Erth line (Western route · ELR MLN4). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β