Trencreek level crossing

Automatic open level crossing with barriers level crossing on the Western route (ELR NEW).

predicted
OPEN
for 15 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 16 min Β· 1 min late

Next 30 min

OPEN 10:44–10:59 15m
CLOSED 10:59–11:00 2m
OPEN 11:00–11:21 β†’ 21m
Under the hood
Thu 22 Oct Β· 10:44
Today Tomorrow

Trains in window

11:00 πŸš† 2N08 Par β†’ Newquay Down (E β†’ W) +1 min
πŸš†Passenger
now 10:44:06 Β· 30 avg Β· 1 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,213 active Β· 31,727 delays Β· 2,032 cancelled Β· 9 reconnects
Nearby crossings

All 235 crossings in Wales & Western β†’

About this crossing

How often it closes

On today’s timetable, Trencreek crossing is predicted to be closed for about 1 h between 06:00 and 22:00, across roughly 30 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 06:56–07:56 in the morning and around 20:16–21:16 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is near Newquay, Cornwall.

Trencreek is a automatic open level crossing with barriers crossing (AOCLB) on the Par–Up line (Western route · ELR NEW). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’