East Boldon level crossing

CCTV-monitored manual barrier level crossing on the East Coast route (ELR LEN3).

right now
CLOSED
for 2 min
next: 🚧 in 2 min · on time

Next 30 min

CLOSED 00:15–00:17 2m
OPEN 00:17–02:15+ 1h+
Under the hood
Fri 24 Jul · 00:15
Today Tomorrow

Trains in window

00:10 5N62 🚃 HRTLEPL → NWCSTLE ← from Sunderland on time
00:11 6Y23 🚧 CARLILY → SEAHAM → from Brockley Whins -3 min
00:17 3Q00 🚧 JARRGBF → JARRGBF → from Brockley Whins approaching
🚃Empty stock 🚧Engineering
now 00:15:54 · 109 avg · 3 in window
lx berths down: T3/6227→T3/[email protected] · up: T3/6242→T3/[email protected] · up: T3/6254→T3/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,036 active · 29,996 delays · 1,739 cancelled · 0 reconnects
Nearby crossings

All 867 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, East Boldon crossing is predicted to be closed for about 11 h 3 min between 06:00 and 22:00, across roughly 91 closures. The longest single predicted closure is 12 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 11.5 min (00:00–00:12, 3 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:00–07:00 in the morning and around 16:12–17:12 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

East Boldon is a cctv-monitored manual barrier crossing (CCTV) on the Sunderland–Brockley Whins line (East Coast route · ELR LEN3). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 6 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 96.1% of the warnings we could verify came true.

Typical timing error was ±58s (9 in 10 within 984s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?