Findern level crossing

Automatic half-barrier level crossing on the East Midlands route (ELR NSS).

right now
OPEN
for 5 min
next: 🚛 in 6 min · running

Next 30 min

OPEN 01:10–01:14 5m
CLOSED 01:14–01:16 2m
OPEN 01:16–01:23 7m
CLOSED 01:23–01:24 2m
OPEN 01:24–02:50 → 85m
Under the hood
Fri 24 Jul · 01:10
Today Tomorrow

Trains in window

01:02 0E15 ELGHENY → DONCDDG → from Barton Under Needwood RSMD no show
01:16 6E68 🚛 KNGSBOS → IMNGHOR → from Barton Under Needwood RSMD active
01:24 6E30 🚛 MRGMTC → HRTL20 → from Barton Under Needwood RSMD +3 min
🚛Freight Other
now 01:10:07 · 271 avg · 3 in window
lx berths up: BU/0185→BU/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,084 active · 30,121 delays · 1,791 cancelled · 0 reconnects
Nearby crossings

All 867 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Findern crossing is predicted to be closed for about 5 h 26 min between 06:00 and 22:00, across roughly 108 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (01:00–01:02, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:13–08:13 in the morning and around 12:02–13:02 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Findern is a automatic half-barrier crossing (AHB) on the Derby–Barton Under Needwood RSMD line (East Midlands route · ELR NSS). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 4 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Typical timing error was ±38s (9 in 10 within 76s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?