Green Lane level crossing

Manually-controlled barrier with obstacle detection level crossing on the North and East route (ELR BWC).

predicted
OPEN
for at least 2h

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 02:58–04:58+ 2h+
Under the hood
Mon 07 Sep · 02:58
Today Tomorrow

Trains in window

No trains in the next 30 minutes.
now 02:58:18 · 61 avg · 0 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 48,326 active · 21,078 delays · 2,888 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Green Lane crossing is predicted to be closed for about 4 h 44 min between 06:00 and 22:00, across roughly 69 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 10:20–11:20 in the morning and around 12:56–13:56 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Green Lane is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Northumberland Park (NE)–Lynemouth Power Stn (GBRF) line (North and East route · ELR BWC). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 469 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Typical timing error was ±2s (9 in 10 within 219s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?