CCTV-monitored manual barrier level crossing on the Western route (ELR BHL).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:51 | π 1J74 | Plymouth β London Paddington Up (W β E) | +5 min |
| 10:07 | π 1C74 | London Paddington β Plymouth Down (E β W) | approaching |
| 10:09 | π 2T10 | Bedwyn β Newbury Up (W β E) | on time |
| 10:10 | π 6A40 | Merehead Quarry (FHH) β Hanwell Bridge Loop Up (W β E) | approaching |
| 10:26 | π 2T11 | Newbury β Bedwyn Down (E β W) | active |
| 10:29 | π 1C75 | London Paddington β Paignton Down (E β W) | +12 min |
On todayβs timetable, Hamstead crossing is predicted to be closed for about 5 h 53 min between 06:00 and 22:00, across roughly 70 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 6.8 min (08:13–08:20, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 10:35β11:35 in the morning and around 18:36β19:36 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Milkhouse Road in Marsh Benham, Berkshire.
Hamstead is a CCTV-monitored manual barrier crossing (CCTV) on the ThatchamβBedwyn line (Western route · ELR BHL). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 574 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 98.2% of the warnings we could verify came true.
Typical timing error was Β±3s (9 in 10 within 20s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.