Manually-controlled barrier level crossing on the Western route (ELR BHL).
| No trains in the next 30 minutes. |
On today’s timetable, Kintbury crossing is predicted to be closed for about 5 h 51 min between 06:00 and 22:00, across roughly 72 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 10:23–11:23 in the morning and around 14:38–15:38 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Kintbury is a manually-controlled barrier crossing (MCB/MB) on the Newbury–Bedwyn line (Western route · ELR BHL). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 410 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 97.3% of the warnings we could verify came true.
Typical timing error was ±120s (9 in 10 within 478s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.