Hungerford level crossing

CCTV-monitored manual barrier level crossing on the Western route (ELR BHL).

predicted
CLOSED
for 3 min Β· held for a second train βœ“

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 3 min Β· 1 min late

Next 30 min

CLOSED 09:59–10:02 3m
MAY OPEN 10:02–10:03 43s
CLOSED 10:03–10:08 5m
MAY OPEN 10:08–10:08 36s
CLOSED 10:08–10:11 3m
OPEN 10:11–10:32 β†’ 21m
Under the hood
Thu 22 Oct Β· 09:59
Today Tomorrow

Trains in window

09:53 πŸš› 6V53 Oxford Banbury Road β†’ Whatley Quarry F Liner HH Down (E β†’ W) no show
10:02 πŸš† 2T10 Bedwyn β†’ Newbury Up (W β†’ E) approaching
10:07 πŸš› 6A40 Merehead Quarry (FHH) β†’ Hanwell Bridge Loop Up (W β†’ E) -4 min
10:11 πŸš„ 1C74 London Paddington β†’ Plymouth Down (E β†’ W) approaching
πŸš„Express passenger πŸš†Passenger πŸš›Freight
now 09:59:36 Β· 162 avg Β· 4 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,698 delays Β· 1,962 cancelled Β· 9 reconnects
Nearby crossings

All 235 crossings in Wales & Western β†’

About this crossing

How often it closes

On today’s timetable, Hungerford crossing is predicted to be closed for about 6 h 13 min between 06:00 and 22:00, across roughly 75 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 10.8 min (01:26–01:37), measured from this crossing’s protecting signals: the signal can only show a proceed aspect with the barriers proven down, so this is the signalling system’s own record of the barriers, with standard allowances for the lowering sequence and the raise. It can differ from the forecast timeline above: this is what actually happened, not what was predicted.

Worst times to cross today

Closures cluster around 10:33–11:33 in the morning and around 16:59–17:59 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is in Hungerford, Berkshire, next to the station.

Hungerford is a CCTV-monitored manual barrier crossing (CCTV) on the Newbury–Bedwyn line (Western route · ELR BHL). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 574 trains through this crossing.

99.7% of observed passes were being warned about on this page when they passed, and 98.6% of the warnings we could verify came true.

Typical timing error was Β±7s (9 in 10 within 132s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?