CCTV-monitored manual barrier level crossing on the East Midlands route (ELR WEB).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:58 | π 4E00 | London Gateway GBRF β Tinsley Yard GBRf Down | +44 min |
| 10:06 | π 2K10 | Peterborough β Lincoln Down | +2 min |
| 10:11 | π 2K07 | Lincoln β Peterborough Up | +1 min |
| 10:26 | π 4E23 | Felixstowe North F.L.T. β Leeds F.L.T. Down | no show |
| 10:26 | π 4L19 | Doncaster Iport GBRF β London Gateway GBRF Up | no show |
On todayβs timetable, Hawthorn Bank crossing is predicted to be closed for about 2 h 24 min between 06:00 and 22:00, across roughly 32 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 09:06β10:06 in the morning and around 19:31β20:31 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Hawthorn Bank in Spalding, Lincolnshire.
Hawthorn Bank is a CCTV-monitored manual barrier crossing (CCTV) on the DownβUp line (East Midlands route · ELR WEB). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β