Hele and Bradninch level crossing

Automatic half-barrier level crossing on the Western route (ELR MLN1).

predicted
OPEN
for 7 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 8 min Β· 1 min early

Next 30 min

OPEN 07:17–07:24 7m
CLOSED 07:24–07:26 2m
OPEN 07:26–07:29 3m
CLOSED 07:29–07:30 2m
OPEN 07:30–08:02 β†’ 32m
Under the hood
Mon 12 Oct Β· 07:17
Today Tomorrow

Trains in window

07:16 πŸš† 2C07 Bristol Temple Meads β†’ Plymouth Down (NE β†’ SW) passed
07:26 πŸš„ 1S39 Plymouth β†’ Edinburgh Up (SW β†’ NE) approaching
07:30 πŸš„ 1C11 Bristol Temple Meads β†’ Penzance Down (NE β†’ SW) approaching
πŸš„Express passenger πŸš†Passenger
now 07:17:48 Β· 105 avg Β· 3 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-11..2026-10-13
fetched 02:08:22
trust 48,742 active Β· 25,307 delays Β· 2,514 cancelled Β· 0 reconnects
Nearby crossings

All 235 crossings in Wales & Western β†’

About this crossing

How often it closes

On today’s timetable, Hele and Bradninch crossing is predicted to be closed for about 3 h 46 min between 06:00 and 22:00, across roughly 89 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (01:15–01:17, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 10:58–11:58 in the morning and around 20:38–21:38 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Station Road in Hele, Devon.

Hele and Bradninch is a automatic half-barrier crossing (AHB) on the Taunton–Exeter Riverside N.Y. line (Western route · ELR MLN1). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 748 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.4% of the warnings we could verify came true.

Full accuracy report β†’

Is this right?