Hele and Bradninch level crossing

Automatic half-barrier level crossing on the Western route (ELR MLN1).

right now
OPEN
for 22 min
next: 🚄 in 23 min · 22 min late

Next 30 min

OPEN 01:14–01:36 22m
CLOSED 01:36–01:38 2m
OPEN 01:38–02:43 → 65m
Under the hood
Fri 24 Jul · 01:14
Today Tomorrow

Trains in window

01:37 1A50 🚄 PENZNCE → PADTON → from Exeter Riverside N.Y. +22 min
🚄Express passenger
now 01:14:51 · 131 avg · 1 in window
lx berths down: EX/E044→EX/[email protected] · up: EX/U187→EX/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,087 active · 30,126 delays · 1,797 cancelled · 0 reconnects
Nearby crossings

All 228 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Hele and Bradninch crossing is predicted to be closed for about 3 h 58 min between 06:00 and 22:00, across roughly 90 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (00:30–00:31, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 10:58–11:58 in the morning and around 12:56–13:56 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Hele and Bradninch is a automatic half-barrier crossing (AHB) on the Taunton–Exeter Riverside N.Y. line (Western route · ELR MLN1). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 5 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Typical timing error was ±22s (9 in 10 within 95s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?