Crannaford level crossing

Automatic half-barrier level crossing on the Western route (ELR BAE2).

predicted
OPEN
for 14 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 15 min · running

Next 30 min

OPEN 09:59–10:13 14m
CLOSED 10:13–10:14 2m
OPEN 10:14–11:59+ 1h+
Under the hood
Thu 22 Oct · 09:59
Today Tomorrow

Trains in window

10:14 🚄 1L40 Exeter St. David's → London Waterloo Up (SW → NE) active
🚄Express passenger
now 09:59:44 · 22 avg · 1 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active · 31,699 delays · 1,963 cancelled · 9 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Crannaford crossing is predicted to be closed for about 42 min between 06:00 and 22:00, across roughly 17 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 09:52–10:52 in the morning and around 17:57–18:57 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Crannaford Lane in Cranbrook, Devon.

Crannaford is a automatic half-barrier crossing (AHB-X) on the Honiton–St. James' Park line (Western route · ELR BAE2). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?