Holme (No.31) level crossing

Manually-controlled barrier with obstacle detection level crossing on the Wessex route (ELR BML2).

predicted
OPEN
for 7 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 10 min · 4 min late

Next 30 min

OPEN 10:00–10:07 7m
CLOSED 10:07–10:10 3m
OPEN 10:10–10:18 8m
CLOSED 10:18–10:22 3m
OPEN 10:22–10:36 → 15m
Under the hood
Thu 22 Oct · 10:00
Today Tomorrow

Trains in window

10:10 🚄 1W95 London Waterloo → Weymouth Down (E → W) +4 min
10:21 🚄 1W12 Weymouth → London Waterloo Up (W → E) active
🚄Express passenger
now 10:00:36 · 73 avg · 2 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active · 31,699 delays · 1,964 cancelled · 9 reconnects
Nearby crossings

All 234 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Holme (No.31) crossing is predicted to be closed for about 4 h 43 min between 06:00 and 22:00, across roughly 61 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 10:01–11:01 in the morning and around 17:31–18:31 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on the B3070 in Holmebridge, Dorset.

Holme (No.31) is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Wareham–Weymouth line (Wessex route · ELR BML2). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?