Automatic half-barrier level crossing on the Sussex route (ELR TBH2).
Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.
| 17:07 | 🚄 1N45 | Southampton Central → Brighton Up (W → E) | approaching |
| 17:08 | 🚄 1N46 | Brighton → Southampton Central Down (E → W) | approaching |
| 17:15 | 🚄 1S51 | Portsmouth & Southsea → Brighton Up (W → E) | cancelled |
| 17:19 | 🚄 1C42 | London Victoria (C) → Portsmouth Harbour Down (E → W) | +5 min |
| 17:26 | 🚄 1C53 | Portsmouth Harbour → Horsham Up (W → E) | on time |
| 17:30 | 🚄 1S46 | Brighton → Portsmouth & Southsea Down (E → W) | cancelled |
| 17:38 | 🚄 1N47 | Southampton Central → Brighton Up (W → E) | cancelled |
On today’s timetable, Inlands Road crossing is predicted to be closed for about 5 h 34 min between 06:00 and 22:00, across roughly 107 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 5.1 min (11:29–11:34, 3 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 08:18–09:18 in the morning and around 13:28–14:28 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Inlands Road is a automatic half-barrier crossing (AHB) on the Chichester–Havant line (Sussex route · ELR TBH2). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 1,101 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 98.4% of the warnings we could verify came true.
Typical timing error was ±91s (9 in 10 within 138s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.