CCTV-monitored manual barrier level crossing on the Wessex route (ELR TBH2).
Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.
| No trains in the next 30 minutes. |
On today’s timetable, Warblington crossing is predicted to be closed for about 7 h 36 min between 06:00 and 22:00, across roughly 100 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 07:18–08:18 in the morning and around 14:10–15:10 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Warblington is a cctv-monitored manual barrier crossing (CCTV) on the Chichester–Havant line (Wessex route · ELR TBH2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 985 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 98.5% of the warnings we could verify came true.
Typical timing error was ±5s (9 in 10 within 114s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.