Warblington level crossing

CCTV-monitored manual barrier level crossing on the Wessex route (ELR TBH2).

predicted
OPEN
for 6 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 9 min Β· on time

Next 30 min

OPEN 07:36–07:42 6m
CLOSED 07:42–07:45 3m
MAY OPEN 07:45–07:46 1m
CLOSED 07:46–07:50 3m
OPEN 07:50–07:56 6m
CLOSED 07:56–07:59 3m
MAY OPEN 07:59–08:00 54s
CLOSED 08:00–08:03 3m
OPEN 08:03–08:09 β†’ 6m
Under the hood
Wed 11 Nov Β· 07:36
Today Tomorrow

Trains in window

07:28 πŸš„ 1C02 Three Bridges β†’ Portsmouth Harbour Down (E β†’ W) on time
07:28 πŸš„ 1C13 Southampton Central β†’ Horsham Up (W β†’ E) +5 min
07:32 πŸš„ 1S07 Portsmouth Harbour β†’ Brighton Up (W β†’ E) +5 min
07:32 πŸš„ 1S06 Brighton β†’ Portsmouth & Southsea Down (E β†’ W) passed
07:45 πŸš„ 1N08 Brighton β†’ Southampton Central Down (E β†’ W) on time
07:49 πŸš„ 1C15 Portsmouth & Southsea β†’ Horsham Up (W β†’ E) on time
07:59 πŸš„ 1C04 London Victoria (C) β†’ Portsmouth Harbour Down (E β†’ W) on time
08:03 πŸš„ 1N09 Southampton Central β†’ Brighton Up (W β†’ E) on time
πŸš„Express passenger
now 07:36:53 Β· 190 avg Β· 8 in window
live observation: 1 up Β· 2 down
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,748 active Β· 31,255 delays Β· 2,057 cancelled Β· 0 reconnects
Nearby crossings

All 234 crossings in Southern β†’

About this crossing

How often it closes

On today’s timetable, Warblington crossing is predicted to be closed for about 9 h between 06:00 and 22:00, across roughly 114 closures. The longest single predicted closure is 12 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.2 min (23:59–00:05, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:26–09:26 in the morning and around 14:10–15:10 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Southleigh Road in Havant, Hampshire, next to Warblington station.

Warblington is a CCTV-monitored manual barrier crossing (CCTV) on the Chichester–Havant line (Wessex route · ELR TBH2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 1,211 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.2% of the warnings we could verify came true.

Typical timing error was Β±5s (9 in 10 within 87s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?