CCTV-monitored manual barrier level crossing on the Wessex route (ELR TBH2).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:50 | π 1N16 | Brighton β Southampton Central Down (E β W) | +6 min |
| 09:57 | π 1C12 | London Victoria (C) β Portsmouth Harbour Down (E β W) | cancelled |
| 10:02 | π 1C23 | Portsmouth Harbour β Horsham Up (W β E) | approaching |
| 10:05 | π 1N17 | Southampton Central β Brighton Up (W β E) | +2 min |
| 10:12 | π 1S23 | Portsmouth & Southsea β Brighton Up (W β E) | active |
| 10:18 | π 1N18 | Brighton β Southampton Central Down (E β W) | +3 min |
| 10:26 | π 1C25 | Portsmouth Harbour β Horsham Up (W β E) | active |
| 10:27 | π 1C14 | London Victoria (C) β Portsmouth Harbour Down (E β W) | +8 min |
On todayβs timetable, Warblington crossing is predicted to be closed for about 9 h 17 min between 06:00 and 22:00, across roughly 118 closures. The longest single predicted closure is 12 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 8.7 min (08:19–08:27, 3 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 08:26β09:26 in the morning and around 14:10β15:10 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Southleigh Road in Havant, Hampshire, next to Warblington station.
Warblington is a CCTV-monitored manual barrier crossing (CCTV) on the ChichesterβHavant line (Wessex route · ELR TBH2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 1,094 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 98.4% of the warnings we could verify came true.
Typical timing error was Β±4s (9 in 10 within 85s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.