CCTV-monitored manual barrier level crossing on the Wessex route (ELR WPH2).
| 00:14 | 5S71 | 🚃 | PSEA → LTLHMPT | → from Fratton | +7 min |
| 00:39 | 2P75 | 🚆 | WATRLMN → FRATTON | ← from Havant | on time |
On today’s timetable, Bedhampton crossing is predicted to be closed for about 11 h 41 min between 06:00 and 22:00, across roughly 85 closures. The longest single predicted closure is 22 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 07:39–08:39 in the morning and around 16:54–17:54 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Bedhampton is a cctv-monitored manual barrier crossing (CCTV) on the Havant–Fratton line (Wessex route · ELR WPH2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 881 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 98.0% of the warnings we could verify came true.
Typical timing error was ±24s (9 in 10 within 116s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.