Southbourne level crossing

CCTV-monitored manual barrier level crossing on the Sussex route (ELR TBH2).

right now
OPEN
for the next 30 min

Next 30 min

OPEN 01:11–02:44 → 94m
Under the hood
Fri 24 Jul · 01:11
Today Tomorrow

Trains in window

No trains in the next 30 minutes.
now 01:11:11 · 190 avg · 0 in window
lx berths down: CH/0105→CH/[email protected] · up: CH/0108→CH/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,086 active · 30,123 delays · 1,793 cancelled · 0 reconnects
Nearby crossings

All 236 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Southbourne crossing is predicted to be closed for about 10 h 2 min between 06:00 and 22:00, across roughly 105 closures. The longest single predicted closure is 12 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.6 min (23:58–00:05, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:57–08:57 in the morning and around 14:25–15:25 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Southbourne is a cctv-monitored manual barrier crossing (CCTV) on the Chichester–Havant line (Sussex route · ELR TBH2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 1,093 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.0% of the warnings we could verify came true.

Typical timing error was ±48s (9 in 10 within 163s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?