CCTV-monitored manual barrier level crossing on the Wessex route (ELR WPH2).
Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.
| 02:13 | 🚧 8Y84 | Totton Yard → Totton Yard Up (W → E) | no show |
On today’s timetable, Havant crossing is predicted to be closed for about 11 h 30 min between 06:00 and 22:00, across roughly 111 closures. The longest single predicted closure is 13 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 06:40–07:40 in the morning and around 15:18–16:18 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Havant is a cctv-monitored manual barrier crossing (CCTV) on the Chichester–Fratton line (Wessex route · ELR WPH2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 987 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.1% of the warnings we could verify came true.
Typical timing error was ±4s (9 in 10 within 118s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.