CCTV-monitored manual barrier level crossing on the North and East route (ELR TJC3).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:56 | π 2H29 | Skipton β Leeds Up (W β E) | passed |
| 09:59 | π 2H26 | Leeds β Skipton Down (E β W) | active |
| 10:02 | π 6E99 | Wellingborough Up TC GBRf β Rylstone Tilcon Down (E β W) | approaching |
| 10:03 | π 6D25 | Rylstone Tilcon β Hull Dairycoates Tlcn GBRf Up (W β E) | no show |
| 10:04 | π 6E99 | Leyland Sidings GBRF β Arcow Quarry GBRf Down (E β W) | -13 min |
| 10:11 | π 2S17 | Skipton β Bradford Forster Square Up (W β E) | active |
| 10:14 | π 1M53 | Leeds β Carlisle Down (E β W) | +23 min |
| 10:17 | π 6D63 | Doncaster Down Decoy GBRF β Rylstone Tilcon Down (E β W) | no show |
| 10:21 | π 2S14 | Bradford Forster Square β Skipton Down (E β W) | active |
| 10:24 | π 2H31 | Skipton β Leeds Up (W β E) | active |
| 10:29 | π 2H28 | Leeds β Skipton Down (E β W) | active |
On todayβs timetable, Kildwick crossing is predicted to be closed for about 11 h 32 min between 06:00 and 22:00, across roughly 83 closures. The longest single predicted closure is 19 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 8.5 min (07:03–07:12, 3 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:57β07:57 in the morning and around 18:12β19:12 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Skipton Road in Crosshills, North Yorkshire.
Kildwick is a CCTV-monitored manual barrier crossing (CCTV) on the Leeds Balm Rd Loco (FHH)βSkipton line (North and East route · ELR TJC3). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 1,144 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.9% of the warnings we could verify came true.
Typical timing error was Β±79s (9 in 10 within 86s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.