Automatic half-barrier level crossing on the North and East route (ELR DRA1).
| 00:27 | 4R40 | 🚃 | DRAXCEG → IMNGBIO | → from Drax PS | no show |
| 00:33 | 6H24 | 🚛 | IMNGBIO → DRAXCEG | ← from Hensall Jn | -7 min |
On today’s timetable, Linwith Lane crossing is predicted to be closed for about 49 min between 06:00 and 22:00, across roughly 17 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 1.5 min (00:29–00:31, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:00–07:00 in the morning and around 14:08–15:08 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Linwith Lane is a automatic half-barrier crossing (AHB) on the Hensall Jn–Drax PS line (North and East route · ELR DRA1). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →